The LemonPepperPorkChop

Jan 2, 2017
322
972
50
Cottam, Ontario, Canada
Got to play in the shop today working on the triple tree top. 1/2" thick plate steel may be overkill, but couldn't pass up the free scrap cut off from my metal supplier.

Welded 5/8" bolts into the top ends of the fork tubes and bolted it all up. A little bit of shaping on the top plate still to be done.

Next on the list, work on the driveline.




Sent from my iPhone using Tapatalk
 
Jan 2, 2017
322
972
50
Cottam, Ontario, Canada
Worked on the springer most of the day today.


Welded four 5/8" nuts to four washers, then added 1/2" washers to those. Welded 1/2" threaded rod to the machined 1/2" plate steel. 1/2" plate to the main fork assembly. Plate steel with threaded rod then washer nut combo then porch swing spring, another washer/nut, through the main fork plate, washer/nut, spring, washer/nut. Topped of with 1/2" nut.



Welded 5/8" nuts into end of fork legs and bolted them on. Rocker arms are the first item on tomorrow's to do list.



Sent from my iPhone using Tapatalk
 
The Bike Wall BOXKARS Clyde James Cycles