Before I'd beat on it hard, or put explosives in a valuable frame, I would consider heat and vibratory methods. This will advance the action of the oil, along the length of the post.
Which is the issue. Oil must seep into a crack the length of the post,
from the ends in. Like 3" each way.
That action slows as the square of the distance. Double the distance= 4x the time.
4x dist= 16x time
If the oil seeps in 1/2" in a day, the second day it will go 1/4". third day 1/8". 4th day 1/16" 5th day 1/32". 6th day 1/64"
How long does the oil take to go 3". In 6 days it goes 63/64" in this (what-if) case.
next week: .0075 + .00375 + .001875 + .00094 + .00049 + .00025 + .000125 = less than 1/64"
It's like Zeno's paradox. Can't get there, from here, that way.
After 2 weeks it soaks almost 2" of the theoretical 6". Just 1" from each end
BUT repeated heat cycles and vibration will speed the process A LOT.