MBBO 3C Patrol

Rat Rod Bikes Bicycle Forum

Help Support Rat Rod Bikes Bicycle Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Found a brake/cable/ lever.. in stash pile. Set the shifter on the backbone.
20240924_141356.jpg
 
I better see if I can muster up some strength to put this thing together.
How much longer before the deadline?
"The Build Off will begin at 12 am North American Central Time on Sept 1, 2024 and Final finished bike photos must be posted in the “Finished Bikes” thread by 12 noon North American Central Time on Nov 30, 2024"

Plenty of time 👍
 
Back
Top