After chatting with oj I have decided to just run single speed 3 piece crank. Had to break out a little leverage to get the bb back to square. Broke the braze on the down tube so will have to weld that now as well
Sent from my SM-G900R4 using Tapatalk
So i got the rear triangle cut off. The gob weld on the seat post ground down to reweld. Sleeves for the chain stays. All ready to weld
Sent from my SM-G900R4 using Tapatalk
I am not familiar with any of this metric, Allen wrenches, cables, derailers, brake bosses lol. I need a tetanus shot for most of what I turn wrench on, and I most always a standard wrench! Lol
Sent from my SM-G900R4 using Tapatalk
Valid points, most of them I hadn't even considered. I guess I will have to mock the bike up more before going to nuts. I have other frame options I could switch to. The reason I chose the cwc is I didn't want to weld the brake studs on the shelby frame I originally chosen
Sent from my...
Got the rear stays on the doner triangle widened out for hub clearance. Did some measuring and marking ready to cut
Sent from my SM-G900R4 using Tapatalk