Going back the other way. I had a bunch of pics. But they all keep loading upside down. Got all the front brakes and wheels on. Rear fender with music staff is on and bolted down. Been a hard battle making the mock up of the dual drive train work right along with the front brake. Still waiting on the tank to be painted. Need to do lights and cover seat. Still a long ways to go. But so far a great team effort by everyone involved with my shop S&H Bicycle Store.
Ohhhhh look what showed up for the rat rob build off 12 bike!!!! Thanks to Eliz Abeth a good friend of mine. We are entering the home stretch on this build.
Rat rod bikes build off 12 #BLUESSICAL comming together. Need to do a little seat covering today. Tank is painted. Put the dual drive train back together along with the rear brake. Vinal should be done Monday. We're putting the bike back together