Re: Red Rocket Bomber(new photos and a video 10*15*08)
So I’ve been riding Red for a week…
And the brakes were working out great…
But the side pull brakes had a lot of flex in the arms and thought
For a Klunker… That will be hitting the trails as well the pavement…
I needed a brake set up that would not get ripped off the frame…
So…
I cut off some brake studs from a donor and added them to the front fork…
Used a piece of metal strap that had holes in it for my jig…
This jig setup worked really well… I know I’ll use it again…
Juggernaut was silver soldered…
I am using brass braze this time… Silver solder is a little pricey…
I would of taken more progress photos but it was getting dark…
Day pictures are just so much better…
With the front fork done…
I shelved the dual side pull brakes for an up grade…
I added some more brake studs to the frame…
I’ll be using a modified gyro cable splitter to operate the back brakes…
The handle bars, stem, brake handles,
and shift levers were also up graded…
It’s starting to get cold here in Kansas City…
I still need to get the frame and fork cleaned up and painted…
I think I need two warm 65-degree days…
Got my fingers crossed…
I’m loving all the builds guys…
Keep Up The Good Work All…
ponytailmike
mike
So I’ve been riding Red for a week…
And the brakes were working out great…
But the side pull brakes had a lot of flex in the arms and thought
For a Klunker… That will be hitting the trails as well the pavement…
I needed a brake set up that would not get ripped off the frame…
So…
I cut off some brake studs from a donor and added them to the front fork…
Used a piece of metal strap that had holes in it for my jig…
This jig setup worked really well… I know I’ll use it again…
Juggernaut was silver soldered…
I am using brass braze this time… Silver solder is a little pricey…
I would of taken more progress photos but it was getting dark…
Day pictures are just so much better…
With the front fork done…
I shelved the dual side pull brakes for an up grade…
I added some more brake studs to the frame…
I’ll be using a modified gyro cable splitter to operate the back brakes…
The handle bars, stem, brake handles,
and shift levers were also up graded…
It’s starting to get cold here in Kansas City…
I still need to get the frame and fork cleaned up and painted…
I think I need two warm 65-degree days…
Got my fingers crossed…
I’m loving all the builds guys…
Keep Up The Good Work All…
ponytailmike
mike