Update on the Whizzer semi-board tracker. Built the gas tank last week and just finished painting it. Parts came back from the plater, and the final twin spring front end is in place. In these photos, the handlebar stem needs shortening, and the front tire is a temp while the correct tire and rim are out for re-spoking and drum brake installation. The handlebar levers and throttle are in place, too.
The tank side panels are a "distressed brass" finish that I came up with, as the all-black tank was too boring looking.
I'm hoping to have this completed early next year...