'81 Chevy Project Goes Away

Rat Rod Bikes Bicycle Forum

Help Support Rat Rod Bikes Bicycle Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Re: New Project Truck- Mono-chrome!

So far between paint and primer I will guess 20 cans. I still need to wet sand and shoot the whole thing one more time. I left a couple blankets behind.

Ordered my airbags yesterday so hopefully we get some nice weather next weekend!
 
Re: New Project Truck- Mono-chrome!

COOL! When I get to that point on the suspension on my delivery, I may need some advice!
 
Re: New Project Truck- Mono-chrome!

Bags and suspension parts are on the way and since is is snowing again I decided to create some artist renditions to let me see how some different paint schemes.

598775_10200412493549317_1749602614_n.jpg


I like these scallops more. Maybe in Metal Flake silver...
181075_10200412493629319_1145876455_n.jpg
 
Re: New Project Truck- Mono-chrome!

Nice I like the scallop idea, personally I'd go for a red scallop with white pinstripe around the edges.

181075_10200412493629319_1145876455_n_zpsbbca76df.jpg
 
Re: New Project Truck- Mono-chrome!

Is that the same heep what was sitting in the drive last I was up there.... Looking good :mrgreen:
 
Re: New Project Truck- Mono-chrome!

she is looking good.. I get my gas tank back in my heap .. I will run it up and have a look ...
 
Re: New Project Truck- Bags Have Arrived

My bag kit showed up today! I am still waiting on my step notch kit to get here and, unfortunately for me, the 4-link, the bags, and everything else has to wait until the stop notch is installed to move forward.

I did spend the evening assembling the valve assemblies and, reading the instructions for everything
 
Re: New Project Truck- Bags Have Arrived

Can't wait to see the stuff installed! Looking good so far.
 
Re: New Project Truck- Bags Have Arrived

My Step Notch left Sacramento tonight and UPS says it will be here on Wednesday. That means next weekend will be busy for me!
I will be done in time to load up and sell some bike parts at the Midwest Bicycle Swap!
 
Re: New Project Truck- Bags Have Arrived

A few pics of my progress this past week.

Test layout of the valves in the 20mm High Explosive ammo crate I am using to house some of the air bag hardware.
604041_10200498608982149_2089928219_n.jpg


The crate sitting in it's future home.
555955_10200498609142153_169014357_n.jpg



Hard to see the industrial switch on the side of the crate that I added to give me a remote drop button.
533997_10200498609102152_1021299908_n.jpg


Valve layout for the box as I was wiring the solenoid coils.
45277_10200498609422160_2107173361_n.jpg


I am itching to get everything mounted and drop it to the ground!
 
Re: New Project Truck- Suspension Upgrade Weekend

At 8:00 this morning when I am usually getting ready for bed I started my air bag installation.
541817_10200515499924412_597152955_n.jpg


I had a couple friends from work stop by to help me get the bed off the truck. One helped and hung around for about a half hour before he went home to sleep. Shortly after he left my best friend, another coworker and the guy I bought the truck from, stopped in. With their help I joined the club of people crazy enough to cut their frame in half.
35010_10200515504764533_2080204435_n.jpg


I got the step notch installed on both frame rails. Not as much as I had hoped to accomplish on Day 1, but there was so much cutting and test fitting that I feel like it was a good day. Tomorrow I will start off installing the 4-link and panhard bar. After that bags and associated equipment and then wheel well and bed modifications.

I would like to get everything done by 4pm tomorrow when my local AutoZone is holding their annual car show. I doubt I will make it by then but my original goal of completing everything by Sunday evening is completely achievable.

I have been up for 32 hours now and am done for the day. Good night everyone. This builder is going to bed. Stay tuned through the weekend to watch everything come together.
 
Re: New Project Truck- Suspension Upgrade Weekend

Looks like you made quite a bit of progress! It's a lot more work than most people realize, but well worth it IMO. 8)
 
Re: New Project Truck- Suspension Upgrade Weekend

Suspension Upgrade Day 2:

Fell a little further behind where I had hoped to be today, but most of the cutting and grinding should be done now. Tomorrow I will get the bags in, plumbed, and functioning. Hope to get the bed mods done as well.

My daughter came out and helped with the assembly and ran the camera as well.

Began by yanking the leaf springs and front hangers
319970_10200519638507874_2120375335_n.jpg


537371_10200519638627877_811796955_n.jpg


644488_10200519638867883_997333631_n.jpg


Leaves out and fixing to start cutting and grinding on the lower spring pedestals and shock mounts.
60654_10200520744895533_1235018332_n.jpg


524136_10200520745015536_1453567794_n.jpg


320052_10200520745415546_659462498_n.jpg


58900_10200520745375545_1210515469_n.jpg


562585_10200520746055562_1964848801_n.jpg


Reattaching the driveshaft to the yolk
604158_10200520746495573_802617049_n.jpg


541365_10200520746615576_2016665719_n.jpg


Hooking the 4-link bars to the axle
7603_10200520746815581_878919939_n.jpg


559852_10200520747095588_1641999147_n.jpg


529577_10200520747535599_64888592_n.jpg


Panhard bar installed
563709_10200520747775605_1539903100_n.jpg


Welding the lower bag mounts to the axle
604084_10200520748015611_1313202135_n.jpg


150469_10200520748215616_349879384_n.jpg


15066_10200520748295618_740365852_n.jpg


Bag mounts in and time to call it a day. Back to work in the morning.
529349_10200520748695628_2115278897_n.jpg


563245_10200520748855632_1445233951_n.jpg
 

Latest posts

Back
Top